You're viewing the old pesn.com website
 

Free Energy is all about freedom:
Power to the people -- literally and figuratively



 "Free Energy" 

News XML
- PESN Specials
- About
- Pure Energy Blog
- Daily FE News
- Features
- Free Energy Now
- This Week in FE
- Newsletter
- How you can help
- Submit  
- Subscribe

 

Directory
Energy Topics

• Alt Fuels
• Anti-Gravity
• Batteries
• Betavoltaic
• Biofuels
 - BioDiesel
 - BioElectricity
 - Biomass
• Body Electric
• Brown's Gas
• Cold Fusion
• Conservation
• Electrolysis
• Electromagnetic OU
• Fuel Cells
• Fuel Efficiency
 - Electric Vehicles
 - Engines
 - Hydroxy
• Fusion
• Geothermal
• Gravity Motors
• Human Powered
• Hydro
• Hydrogen
• Joe Cells
• Lighting
• Magnet Motors
• Nanotechnology
• Nuclear
• Nucl. Remediation
• Oil
• Piezoelectric
• Plasma
• River
• Salt Water Mix
• Solar
• Solid State Gen.
• Tesla Turbines
• Thermal Electric
• Tidal
• Vortex
• Waste to Energy
• Water
 - Water as Fuel
• Wave
• Wind
• Wireless Electricity
• Zero Point Energy
• MORE . . .

Open Source
• Freddy's Cell
• Bedini SG
• Safe Haven Villages
• MORE . . .

Resources
• Awards
• Conservation
• Conspiracy
• Directories
• Investment
• Kudos
• Legal
• Organizations
• Plastic and Energy
• Recycling
• Suppression
• Tools
• Trends
• MORE . . .

Mingling
• OverUnity Forum
• Employment
• Events
• Humor
• Magazines
• Movies
• Newsletters
• Discuss. Groups

Shopping
• Store
• Buyer Beware
- - - - - - - - - -
- Donate
- Contact

 

 

 


/2015/11/02/9602674_In-preparation-for_Sterlings-trip-to-see_GDS-5kW-generator/
You are here:
PureEnergySystems.com > News > November 2, 2015; 15:55 GMT

GDS Technologies' 5 kW back-up generator.

In preparation for Sterling's trip to see GDS Technologies' 5 kW generator

I'm posting what I hope to do, so that you can chime in as to the adequacy, inadequacy of that plan. We hope to have this visit be as convincing as possible, to remove the skepticism that: 1) this is a working exotic free energy technology; 2) GDS really is moving into manufacturing phase; 3) if you make a 50% deposit, you really will get one.

by Sterling D. Allan
Pure Energy Systems News

GDS Technologies has invited me to Toronto, Ontario, Canada to see their 5 kW back-up free energy generator (harnesses the wheelwork of nature in an unconventional way) and tour their manufacturing facility. (Arrival date not chosen yet.)

This morning, I composed the following email to Gregory Potter, CEO, to begin a dialogue about the particulars of my visit. I'm posting it here publicly to allow my audience to chime in if they want, to help make sure we are as thorough and convincing as possible.

We hope to have this visit be as convincing as possible, to remove the skepticism that 1) this is a real, working exotic free energy technology; 2) GDS really is moving into manufacturing phase; 3) if you put a 50% deposit down for one (mention PES for a small discount), you really will get it. Regarding the latter, remember that GDS encourages people come see it for themselves before they put down a deposit for one.

I'll be updating this page as I get relevant input. If you're curious to see what the page looked like, to start with, click here.

Hi Greg,

(At first, I was writing this just as a private email, but after putting so much into it, I thought I might as well be transparent about this and post this in our news, to allow others to comment about the adequacy/inadequacy of this, to meet their satisfaction. So in your response, please be sure to indicate if there is anything you want to keep private.)
[url of this page] 
 
I greatly appreciate your invitation to come out.

In anticipation of my trip to see GDS, I wanted to confirm a few things.
 
My understanding is that the primary purpose for my going will be to do a solid test of a 5 kW generator to the satisfaction of the reasonable skeptics, and videotape the test to put online for the sake of others for whom a trip is much more difficult than it is for me. The posted videos would be at least two: 1) a brief overview, e.g. 5-10 minutes that catches the highlights; 2) a full-length video showing the duration of the test (e.g. livestream feed that YouTube makes available, full-length).
 
I don't know the set-up on your end, but I would anticipate the following parameters in doing the test. I will have my cell phone on me to catch any incoming Skype messages with suggestions during the testing and tour. [To the audience: if you want to communicate with me during the test and tour, be sure you're hooked up with me or Stuart Campbell (who can relay to me) on Skype. I won't be in much of a position to interact with incoming messages, such as to approving contact requests or respond to comments. We'll have a blog page online set up where you can chat in real time. I'll trust Stuart to notify me of anything that requires my input. Please keep your input to me to a minimum: only crucial things. Keep the comments and chit chat to the blog page forum at PESWiki or PESN.]
  • PRE-TEST-RUN
    • I would like to set up a web cam so that people can watch the duration of the test online.
    • Do a comprehensive overview (video and photos) of the generator and its components, outside and inside the cabinet.
    • Be able to look inside various compartments to see the inner items of the system. The most thorough version of this would take place primarily before and/or after the test run. But I would like to do periodic checks during the test as well, of things like batteries, for example.
  • CONTINUOUS RUN TEST
    • Be able to run a full 5 kW load, or close to it.
    • Be able to run the generator continuously, without stopping, for at least 4 hours, hopefully longer, under observation. (I'd like to run it for 6-8 hours, ideally.)
    • Be able to move the generator during the test, or at least immediately before or after, to show that there are no hidden wires going up to it from the floor. Ideally, we'd be able to move it every ~15 minutes for the sake of those watching on the live stream.
  • MEASUREMENTS
    • Be able to test before/during/after voltages on any battery(s) in the system.
    • Be able to isolate the single or three-phase wires going to the load to test amperage going to them via a clamp-on amp meter.
  • LOAD TESTING (After the full 5 kW load test run)
    • I'd like to plug the load(s) into power coming from the mains, to compare the readings.
    • I'd like to take at least an hour to test the system to see how well it is able to handle changes in load (from a practicality point of view), so I would be plugging and unplugging some of the load and testing how the amperage, volts, and frequency changes or not, going to existing loads.
    • I also want to test various kinds of resistive loads (lights, resistive heaters) and inductive loads (motors), as well as things like CFL bulbs, to see that they function properly running from the 5 kW generator.
  • (OPTIONAL) TEST GENERATOR DURABILITY TO DESTRUCTION 
    (I'd like to do some idiot testing on the resilience of the generator, unless you already have had such tests done and can show me the results of those tests. I would guess that your ESA certifications included at least some of these kinds of tests.)
    1. While the system is running, move it around, gently.
    2. While the system is running, tip it over, on its side (with something soft to land on, to prevent denting). I would expect that the water would run out and get on electrical components. I'll be looking for how well the emergency shut-off and breaker switches work.
    3. After tipping it on its side, then restoring it to a right-side-up position, I'd like to see if we can refill the reservoir and then run it again. (In other words, if it tips over for a customer, without damaging the hardware by the fall, will they not be able to use it again because of water on circuitry causing circuitry shorts or other non-resolvable electrical faults?)
    4. (Intentionally, to destruction) While it's running, move it around rigorously, intentionally jolting it severely, so see how much abuse it will handle. This testing could include pushing it over with force while running so it lands abruptly on a concrete surface.
    5. (Will need to be a second unit that we can test to destruction.) If we have time, and there is the weather or other below-freezing accommodations we can use, I would like to test the system to see how it recovers after the water has been allowed to freeze in the reservoir. Will that destroy it, or is it designed to handle that?
This latter section raised some questions for me regarding operation at below-freezing temperatures. I doubt we'll have the time or resources to run these tests while we're there. I would imagine the generator could operate to well below freezing as long as it is running. In situations where the generator is situated outside, what will you be recommending to customers? Anti-freeze?

Also, I'm curious how many test/demo generators you have on hand. From a redundancy point of view, I would hope you have several.
 
I'm Cc'ing ***, who lives there in Oshawa and posted a video link in the comments of our story, where he drove by to confirm that there really is your GDS marquee sign out front. He also noted a security person in a car at the entrance.
 
If it's okay, I'd like to involve him (and/or another guy from Toronto we're in touch with) in our testing, to provide things like multimeters, clamp-on amp meter, and a load. He's suggesting that the heater listed in this link would be an ideal load, being just 200 W shy of 5k.
 
He could probably help us locate somewhere that we could place the generator to test how it recovers from below-freezing temperatures with water in the reservoir, if you are okay with us running that test.
 
What do you usually use for a load for demonstrations? That part is not crucial for us to bring independent equipment. What is important (not inextricably so) is that we be able to isolate the wires going to the load to test the amperage going to them.
 
Also, from a general business stand-point (separate from specific business conversations with *** and/or *** about their manufacturing/distribution interest), while I'm there, I'm hoping to be able to do the following, either publicly, or under NDA if needed. I'd like to videotape as much of this as possible. It would be nice to know ahead of time how much of this I'll be able to videotape.
  • See how many of the 5 kW systems are presently on hand
  • See documentation of any 5 kW systems that have already been sold and installed (e.g. beta testing)
  • Get contact information (with permission) of some customers/testers to consult with them about their experience
  • See your lease agreement
  • See your ESA certification documents
  • See any third party testing documents you might have
  • Get a tour of your facility
  • Meet at least your key personnel
    • Mechanical team
    • Engineering team
    • Business team
    • etc.
  • See your manufacturing sequence: in real time, as presently constituted, if you have anything presently under way; or at least the plans you have prepared for it in the future
I'll look forward to your response.

Sincerely,

| Sterling D. Allan,
| (Pure Energy Systems) PES Network, Inc., CEO
| https://PESWiki.com
|
|   "The best news and directory service on the net
|    regarding exotic free energy technologies."
|
| Profile: https://SterlingDAllan.com
| Home/Office Phone: +1-801-407-1292 (mountain time) [GMT-6]
| Fountain Green, Utah, USA
|
|   "The government's job is to protect freedom, not control our lives."

As mentioned above, by way of follow-up to the previous story, a guy who lives there in Oshawa posted a video of a drive-by he did of GDS Technologies' 313,500 sq. ft. manufacturing facility with rail access.

# # #

What You Can Do

  1. See Suggestions for How to Get Involved with the Roll-out of Exotic Free Energy 
  2. Pass this on to your friends and favorite news sources.
  3. Donate to PES Network to help us keep this news and directory and networking service going.
  4. Subscribe to our newsletter to stay abreast of the latest, greatest developments in the free energy sector.
  5. Let professionals in the renewable energy sector know about the promise of this technology. 

GDS Coverage at PES

See also

Resources at PESWiki.com

Page composed by Sterling D. Allan
Last updated December 03, 2015
 
 

Ads

 

 

"It is harder to crack a prejudice than an atom." // "I'd rather be an optimist and a fool than a pessimist and right." -- Albert Einstein

ADVISORY: With any technology, you take a high risk to invest significant time or money unless (1) independent testing has thoroughly corroborated the technology, (2) the group involved has intellectual rights to the technology, and (3) the group has the ability to make a success of the endeavor.
Schopenhauer
All truth passes through three stages:
   First, it is ridiculed;
   Second, it is violently opposed; and
   Third, it is accepted as self-evident.

-- Arthur Schopenhauer (1788-1860)

    "When you're one step ahead
of the crowd you're a genius.
When you're two steps ahead,
you're a crackpot."

-- Rabbi Shlomo Riskin, (Feb. 1998)

Submit • Privacy • About • Contact

PESWiki Departments:
Latest • News •XMLFeed • Directory • Congress • Top 5 • Open Sourcing

PESN.com
Copyright © 2002-2015, PES Network Inc.